|
|
S T R
E E T
L I G H T I N G S C H E D U L E 1/1/11 |
MDPU No. 268
Cancels MDPU No. 256
For street lighting,
flood lighting and dusk to dawn lighting service on public and
private property and streets, and unaccepted streets, where the
Department has facilities supplying electricity and where the
installation work involved is limited to the necessary lighting
unit and service connection on the same pole.
Rate per Year for the
Standard 4,000 Hour Schedule is as Follows:
| Incandescent |
92W* |
388 kWh |
$74.40 |
| Incandescent |
189W* |
794 kWh |
$109.32 |
| Mercury Vapor
Pole Top |
175W* |
880 kWh |
$130.92 |
| Mercury Vapor |
175W* |
880 kWh |
$104.88 |
| Mercury Vapor |
250W* |
1223 kWh |
$139.08 |
| Mercury Vapor |
400W* |
1896 kWh |
$195.12 |
| Mercury
Vapor |
400W* Flood |
1896 kWh |
$214.80 |
| High Pressure
Sodium |
70W |
350 kWh |
$94.20 |
| High Pressure
Sodium (P.T.) |
70W |
350 kWh |
$100.68 |
| High Pressure
Sodium |
150W |
718 kWh |
$122.64 |
| High Pressure
Sodium |
250W |
1298 kWh |
$172.08 |
| High Pressure
Sodium |
250W Flood |
1298 kWh |
$228.00 |
| High Pressure
Sodium |
400W Flood |
1970 kWh |
$288.00 |
| High Pressure
Sodium |
400W |
1970 kWh |
$250.32 |
- *No further
installation or relocation of these lights will be made
under this rate.
Power Adjustment
To the amount
determined under the preceding provisions shall be added a
Power Adjustment charge in accordance with the Department's Standard
Power Adjustment Clause as from time to time effective in
accordance with law.
Maintenance Charges
The Department will
replace burnt out lamps at no cost at the time of the Street
Light Patrol. If a customer requests replacement of lamps on
weekdays from 4 P.M. to 8 A.M. at times other than during
street light patrol, or on weekends or holidays, an after-hour service
charge will be assessed.
For Lights Requiring a
Pole Installation
An additional one
time construction charge covering pole, wire and labor shall
be made. This construction charge must be paid by the
customer before construction begins. The customer, at his or
her option, may install Department approved metal or wooden
poles and Department and wiring inspector approved
underground wiring, for street lighting only, at his or her
expense. Permanent easements for poles, conductors and other
necessary equipment on private property shall be furnished by
the customer at no charge to the Department. In all cases the
Department will furnish, own and maintain luminaries, lamps,
brackets and photo electric controls.
Determination
of Monthly Consumption for the Purpose of Determining the Power
Adjustment Charge in kWh
| |
Jan |
Feb |
Mar |
Apr |
May |
Jun |
Jul |
| 70W HPS |
37 |
31 |
31 |
26 |
23 |
21 |
22 |
| 70W HPS PT |
37 |
31 |
31 |
26 |
23 |
21 |
22 |
| 150W HPS |
76 |
63 |
62 |
53 |
48 |
43 |
46 |
| 250W HPS |
138 |
114 |
113 |
96 |
87 |
78 |
83 |
| 250W HPS F |
138 |
114 |
113 |
96 |
87 |
78 |
83 |
| 400W HPS |
209 |
173 |
171 |
146 |
132 |
118 |
126 |
| 400W HPS F |
209 |
173 |
171 |
146 |
132 |
118 |
126 |
| 175W MV PT |
93 |
78 |
77 |
65 |
59 |
53 |
56 |
| 175W MV |
93 |
78 |
77 |
65 |
59 |
53 |
56 |
| 250W MV |
130 |
108 |
106 |
91 |
82 |
73 |
78 |
| 400W MV |
201 |
167 |
165 |
140 |
127 |
114 |
121 |
| 400W MV F |
201 |
167 |
165 |
140 |
127 |
114 |
121 |
| 1000W MV |
479 |
398 |
393 |
335 |
303 |
271 |
289 |
| 1000W MV F |
479 |
398 |
393 |
335 |
303 |
271 |
289 |
| 92W INC |
41 |
34 |
34 |
29 |
26 |
23 |
25 |
| 189W INC |
84 |
70 |
69 |
59 |
53 |
48 |
51 |
| 295 INC |
131 |
109 |
108 |
91 |
83 |
74 |
79 |
| 405W INC |
180 |
149 |
147 |
125 |
114 |
102 |
108 |
| |
Aug |
Sep |
Oct |
Nov |
Dec |
Tot |
| 70W HPS |
25 |
28 |
33 |
35 |
38 |
350 |
| 70W HPS PT |
25 |
28 |
33 |
35 |
38 |
350 |
| 150W HPS |
52 |
58 |
68 |
72 |
77 |
718 |
| 250W HPS |
93 |
106 |
122 |
130 |
139 |
1298 |
| 250W HPS F |
93 |
106 |
122 |
130 |
139 |
1298 |
| 400W HPS |
142 |
160 |
185 |
197 |
211 |
1970 |
| 400W HPS F |
142 |
160 |
185 |
197 |
211 |
1970 |
| 175W MV PT |
63 |
71 |
83 |
88 |
94 |
880 |
| 175W MV |
63 |
71 |
83 |
88 |
94 |
880 |
| 250W MV |
88 |
99 |
115 |
122 |
131 |
1223 |
| 400W MV |
136 |
154 |
178 |
190 |
203 |
1896 |
| 400W MV F |
136 |
154 |
178 |
190 |
203 |
1896 |
| 1000W MV |
326 |
366 |
425 |
452 |
484 |
4521 |
| 1000W MV F |
326 |
366 |
425 |
452 |
484 |
4521 |
| 92W INC |
28 |
31 |
36 |
39 |
42 |
388 |
| 189W INC |
57 |
64 |
75 |
79 |
85 |
794 |
| 295W INC |
89 |
100 |
116 |
124 |
132 |
1236 |
| 405W INC |
122 |
137 |
159 |
170 |
181 |
1694 |
Payments
One twelfth of the
above prices shall be billed each and every month beginning
with the month next following the month in which service is
first rendered. The Department reserves the right to render
bills on a bi-monthly basis. The Power Adjustment charge will
be applied on the kWh consumption as shown on table under
heading "Determination of monthly kWh consumption for
the purpose of determining the Power Adjustment charge".
Bills are payable upon presentation.
Excessive Damage
Excessive damage
due to wanton or malicious acts and accidents shall be
charged to the customer at the actual cost of labor and
material required to repair or replace the unit. Excessive
damage is defined as a pole, lamp, fixture or conductor
damaged more than once a year. Notification of excessive
damage shall be made to the customer by the Department prior
to billing for repairs.
Term of Contract
One year. Upon
expiration of the initial contract period, it shall continue
until terminated by either party giving to the other no less
than 3 months notice specifying the date of termination.
Terms and Conditions
The Hudson Light
and Power Department's Standard Terms and
Conditions
in effect from time to time, where applicable hereto and not
inconsistent with any specific provisions hereof, are a part
of this rate.
Effective: January 1, 2011
Filed by Yakov D. Levin, General Manager
*Home *Annual
Report *Calendar *Conservation *
Directions *Emergencies *E-Mail *Forms *
General
Information *Local
Links *Job
Opportunities *News *On-Line
Bill Payment * Open
Solicitations *Power
Supplies * Rates *Services *Your Electric Service
This website has
been created and is maintained by the Hudson Light and Power Department.
Any discrepancy between
information provided on this website and the actual practices, policies, rate
schedules charges, etc. is unintended.
In all such cases, the actual practices, policies, rate schedules, charges,
etc. of the Hudson Light and Power Department shall prevail.
|